Confidential / NDA

Hyperscale data hall containment programme

Location:
Maharashtra
Facility:
Hyperscale · Completed 2025
Scope:
Multiple data halls, phased handover

Challenge — Sequenced handover of halls while rack deployment continued in adjacent zones.

Solution — Prefabricated aluminium containment with a structural grid ceiling, installed hall by hall against an agreed sequence.

Outcome — Contained aisles handed over on the agreed sequence with documented snag closure.

  • Hot Aisle Containment
  • Structural Grid Ceiling
Confidential / NDA

Cold aisle containment retrofit in a live hall

Location:
Karnataka
Facility:
Enterprise · Completed 2024
Scope:
Retrofit across operating rack rows

Challenge — No shutdown window and strict dust, noise, and hot-work restrictions.

Solution — Bolted strut support structure and modular panels installed under permit with continuous containment of debris.

Outcome — Retrofit completed without operational interruption or hot work in the white space.

  • Cold Aisle Containment
  • Strut Support Systems
Confidential / NDA

Firestop and penetration register programme

Location:
Tamil Nadu
Facility:
Colocation · Completed 2025
Scope:
Cable, tray, busway, and pipe penetrations

Challenge — Mixed penetration types requiring different approved systems and full traceability.

Solution — Site survey, penetration register, approved system selection, application, and labelled documentation.

Outcome — Complete register issued at handover with labelled and inspected penetrations.

  • Firestop and Fire-Sealant Works
Confidential / NDA

Pre-certification deep cleaning

Location:
Telangana
Facility:
Colocation · Completed 2024
Scope:
White space, underfloor, and service areas

Challenge — Cleaning to prepare for independent ISO 14644-1 Class 8 particle-count testing.

Solution — HEPA vacuum cleaning, microfibre wiping, controlled waste disposal, and stabilisation period coordination.

Outcome — Space handed over clean and ready for independent agency testing.

  • Deep Cleaning & ISO Class 8 Preparation
Confidential / NDA

MS modular cage deployment

Location:
Uttar Pradesh
Facility:
Colocation · Completed 2025
Scope:
Multiple customer cages with expansion provision

Challenge — Secure customer separation with the ability to expand cages later.

Solution — Modular mesh cage system with removable panels, powder-coated finish, and levelling supports.

Outcome — Cages delivered with documented handover and provision for phased expansion.

  • MS Modular Cage Systems
Confidential / NDA

MMR structural support and containment

Location:
Haryana
Facility:
MMR / Telecom · Completed 2024
Scope:
Overhead support and rack-top framing

Challenge — Dense overhead services with limited routing space.

Solution — Coordinated support drawings and bolted strut assemblies fabricated to site measurement.

Outcome — Clash-free installation with services supported to specified loads.

  • Strut Support Systems