Resources
Technical documents, catalogues, and quality records
Version-controlled documents for design coordination, procurement, and tender evaluation. Selected documents are released on enquiry.
DC Space Company Profile
Company profile · v1.0 · Issued 2026
Hot Aisle Containment — Technical Data Sheet
Technical data sheets · v1.2 · Issued 2026
Cold Aisle Containment — Technical Data Sheet
Technical data sheets · v1.1 · Issued 2026
Strut Channel Support Systems — Catalogue
Product catalogues · v2.0 · Issued 2025
Safety Space Product Catalogue
Product catalogues · v1.0 · Issued 2026
Quality Policy & Inspection Plan
Quality and EHS · v1.0 · Issued 2026
EHS Policy and Site Safety Controls
Quality and EHS · v1.0 · Issued 2026
Containment Installation — Method Statement Summary
Method statements · v1.3 · Issued 2025
Firestop Application — Method Statement Summary
Method statements · v1.0 · Issued 2026
Material Test & Finish Certificates
Certificates and reports · On request · Issued 2026
FAQs
Frequently asked technical questions
- Do you work inside live Data Centre halls?
- Yes. Live works are executed under facility permits with method statements, dust and noise control, and restrictions on hot work.
- Can you supply and install to a client-approved make?
- Yes. Where a make or system is specified, we supply and install to that specification, or propose an equivalent for approval.
- Do you certify ISO Class 8 cleanliness?
- We perform controlled pre-certification cleaning. Testing and certification are performed by an approved independent agency after HVAC/PAC stabilisation.
- What is needed for a quotation?
- A BOQ, drawings, or a scope description with rack counts, aisle lengths, ceiling heights, and site location gives us enough to respond.
Request a proposal
Send your BOQ, drawing, or specification
Share your project documents and our engineering team will revert with a scope review, technical options, and a commercial proposal.
